Loading
Page views this IP this session = 1 of 10 unsubscribed pagesTwin Rivers Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Twin Rivers Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Twin Rivers Wind Farm (Wind , Active) Location in the UK : England, twin rivers Type of installation: Wind on/offshore: on Turbines :14 Capacity : 28 MW Approx Date of 1st power generation:
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Twin Rivers Wind Farm Nr Pasture Farm Swinefleet DN14 8EB England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Twin Rivers 28.7 MW
|
Energy Type: |
Wind Onshore |
County: |
Humberside Country: England LPA: East Riding of Yorkshire Council
|
Site ID and Reference: |
3657 / B0883
District:
|
Applicant: |
NTR
Application :
04/00505/STPLFE
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
14 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
|
Calculated capacity: |
28.7 |
Site Address: |
Moor Lane, Whitgift, East Riding of Yorkshire
|
|
|
County: |
Humberside Region: Yorkshire and Humber
|
OS Coordinates: |
472545 / 472545
|
Development Status: |
Operational
|
Application Submitted: |
1/20/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/15/2015
|
|
|
Generator Live |
8/3/2016
|
This Record Last Updated: |
4/26/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Twin Rivers Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00380RQEN
|
Capacity: |
28413
|
Status: |
Live
|
Accreditation Date: |
1/20/2004
|
|
|
Commission Date: |
8/3/2016
|
|
|
Applicant: |
Twin Rivers Wind Farm Limited
|
Applicant Address: |
The Co-Operative Group
1 Angel Square
MANCHESTER
M60 0AG
England
|
Address: |
Twin Rivers Wind Farm
Nr Pasture Farm
Swinefleet
DN14 8EB
England
|
Site Name: |
Twin Rivers Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G03009NWEN
|
Capacity: |
28413
|
Status: |
Live
|
Accreditation Date: |
1/20/2004
|
|
|
Commission Date: |
8/3/2016
|
|
|
Applicant: |
Twin Rivers Wind Farm Limited
|
Applicant Address: |
The Co-Operative Group
1 Angel Square
MANCHESTER
M60 0AG
England
|
Address: |
Twin Rivers Wind Farm
Nr Pasture Farm
Swinefleet
DN14 8EB
England
|
|
Assumptions: Capacity: 28413kW 28.413 MW, Thus over the month Capacity * 720 hours per month = 20457.36 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 6273 | 22.08% | Issued | 01/03/2018 | | | 8828 | 31.07% | Issued | 01/02/2018 | | | 6916 | 24.34% | Issued | 01/01/2018 | | | 2729 | 9.60% | Issued | 01/01/2018 | | | 6532 | 22.99% | Issued | 01/12/2017 | | | 8040 | 28.30% | Issued | 01/11/2017 | | | 7010 | 24.67% | Issued | 01/10/2017 | | | 8651 | 30.45% | Issued | 01/09/2017 | | | 5194 | 18.28% | Issued | 01/08/2017 | | | 4511 | 15.88% | Issued | 01/07/2017 | | | 4422 | 15.56% | Issued | 01/06/2017 | | | 6064 | 21.34% | Issued | 01/05/2017 | | | 5009 | 17.63% | Issued | 01/04/2017 | | | 5409 | 19.04% | Issued | 01/03/2017 | | | 6664 | 23.45% | Retired | 01/02/2017 | | | 7308 | 25.72% | Retired | 01/01/2017 | | | 5575 | 19.62% | Retired | Sep-16 | 0 | 0 | 4192 | 14.75% | Issued | Aug-16 | 0 | 0 | 1786 | 6.29% | Issued |
|
Capacity: 56 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/6/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|